Quilt With Us

“DIRTY DOZEN” CHALLENGE

     This year we are going to focus on TWELVE unfinished projects!  Our goal is to get these twelve projects completed and off our UFO list!  All you need to do is draw up a list of twelve of your unfinished projects.  It can be something as minimal as making a label, sewing the binding on a quilt, or sewing up a BOM block.  Maybe you have a quilt top waiting to be machine quilted.  Perhaps you have a table runner that is cut out and just waiting to be sewn up!  Do you have a stack of quilt patterns that need to be organized?  Do you have a box full of scraps that need to be cut down into useable squares or strips? Look on your shelves, in your closets, in your tubs, in your bags, or wherever you hide your UFOs and find those twelve projects you plan to complete this year! Number each of these twelve projects because there’s a TWIST to this year’s challenge.  On the first of every month, I will draw a number.  The number I draw is the same numbered UFO project you will work on and complete for that month!  For instance if I draw out number 4, you need to check what project is listed as your fourth UFO and work on that project for that month.  This should be a novel (and fun) way to get some of our pesky UFOs completed!

If you wish to participate, all you need to do is list your twelve UFOs!  (HELPFUL HINT: select projects that you can actually complete in a month!)  

I will cross out your numbered projects as you get them completed.  Please share photos of your UFOs as you complete them.   Prizes will be awarded to all who complete their TWELVE UFOs in their designated months! (This challenge discourages you from getting back-logged.  Trying to ''make up lost time" by getting 2-3 UFOs done in one month is STRESSFUL and that's not how this challenge works!  There's less stress if you follow our challenge: getting ONE project done in the month it is to be completed!)

CHALLENGE PARTICIPANTS:

BETTY- COMPLETED ALL 12! 1. Finish quilting & binding BOM 2. Quilt & bind Strip quilt 3. Finish top of Big Block quilt 4. Baby blanket for the baby 5. Sew some strings on bibs 6. Make car carrier cover 7. "Hugs & Kisses" baby quilt 8. Pillowcases for Mary 9. Hot & Cold Kid Wraps for Mary 10. Curtains for the sewing room 11. Finish the New York Beauty quilt 12. Do another quilt for my DDIL from her grandma

JACKIE1. Blue/orange table quilt 2. Fall layer cake quilt from Aunt and Uncle 3. Birthday FQ quilt 4. SW placemats 5. Christmas layer cake quilt 6. IQ strip quilt 7. Birthday sampler quilt 8. Two Grey Hills 9. Nine Patch exchange 10. Sewing machine mat 11. Accessory bucket 12. Large wrapped cord basket

JAN- COMPLETED ALL 12! 1. Label for 2013 BOM quilt 2. 5-yard quilt (#1) 3. Cat rag quilt 4. Boy's rag quilt 5. Batik from 2010 6. Black/white block quilt 2013 7. Binding for #1 donation quilt 8. Uncle Santa wall hanging 9. Girl's rag quilt 10. 5-yard quilt (#2) 11. Lap quilt from fabric at IQ retreat 2013 12. Southern Stars BOM quilt 2008

LINDA N- 1. Stocking for Lucy 2. Stocking for Harrison 3. Quilt for Harrison 4. Apron for Lucy 5. Set of pillowcases 6. Quilt Halloween Quilt 7. Make microwave potato bags 8. Finish microwave bowls 9. Finish mini heart wall-hanging 10. Quilt & bind baby quilt 11. Make small zippered bags 12. Make bag for beach

LYNNE-1. Green star-binding 2. TB quilted with flowers - binding 3. Scrappy w/ floral border - binding 4. Nativity - binding 5. Patriotic runner - binding 6. Brett's quilt - finish quilting & bind 7. My Sister's Garden - quilt, applique,& bind (the only one of the Lucky 7 to get started) 8. Spring A-door-a-doodle - applique & bind 9. Sandy's mystery - put back together, quilt, & bind 10. Jeremiah quilt - quilt & bind 11. One of the 15 baby quilts in the box  - quilt & bind 12. Another of the 15 baby quilts in the box - quilt & bind

MARCIA-1. Quilt & bind red/navy/green table runner 2. Bind my "Scrappy X" quilt 3. Bind my Rainbow Strip quilt 4. Quilt & bind my 2 1/2" strip quilt (made from Chutes & Ladders jellyroll) 5. Quilt & bind my red strip quilt 6. Quilt & bind black/white strip quilt w/lime spacer squares 7. Sew Maple Leaf blocks (won from Lotto) into quilt top, quilt, & bind 8. Sew autumn colored Sampler Blocks (received from B'day Swap) into quilt top, quilt , & bind 9. Sew yellow & blue "Caring Hearts" into wall hanging 10. Add border to Sandy's Mystery Quilt- then quilt & bind 11. Complete my guild's Black & White strip challenge-sew into top, then quilt & bind 12. Make lap robe from ugly fabric received from my guild members, then quilt, & bind

MARYBETH- 1. Finish Stitcher's Garden Quilt 2. Finish Fiberworks BOM Quilt 3. English Paper Piecing table runner- applique & quilt 4. Quilt Hospice Flower pictures 5. Quilt "Dancing Flowers" wall hanging 6. Finish Black, White and Brights BOM 7. Quilt "sister" quilt 8. Finish Drunkards Path quilt 9. Make Paul's T-shirt quilt 10. Quilt IQ Flower quilt 11. Quilt Turtle quilt 12. Assemble & finish IQ Birthday block quilt

NANCY-1. Sorbet (1/2 sq triangle exchange)- Piece,quilt,& bind 2. Baltimore album miniature quilt- Piece,quilt,& bind 3. Rosebud's Cabin- finish piecing, quilt, & bind 4. Round Robin quilt- quilt & bind. 5. IQ Summer Mystery Quilt- quilt & bind 6. Easter Bunny Wall Hanging- finish piecing, quilt & bind 7. Friendship Mystery Quilt (Circle of Friends)- finish construction, quilt & bind 8. Block-of-the-Month (Lynne's) Halloween- finish top, quilt & bind 9. Expandable Tote Bag- sew on handles & finish 10.  Miniature Pinwheel Quilt- Finish blocks, quilt & bind 11. Red & White Pinwheel Wall Hanging- finish hand quilting & bind 12. Wild Goose Chase Through the Cabins- quilt & bind

PAT- 1. Quilt Exploding Star quilt 2. Put label & binding on BQ2 quilt  3. Finish Silly Socks pillowcases 4.Finish Kat-T-Did bag  5.Quilt Shy Little Kitten  6.Finish and bind Turning 20 quilt (first ugly quilt) 7. Put together Lynne's BOM sampler quilt,quilt & bind. 8.Bind placemats from Patrick Lose cruise 9.Finish Love Letters strip quilt 10. Quilt & bind 2012 NYM quilt 11. Finish Braid Table Runner  12. Put together one of the sets of blocks that are ready and waiting to be made into a quilt  ( I won a few block lotteries)

PEG1. Finish the applique on We Three Kings top.  BONUS POINTS FOR COMPLETING THE ENTIRE TOP!!!  2. Make hanging sleeve for Ribbons of Hope quilt.  3. Piece Addison Star table topper - it's all cut out and ready to sew. 4. Finish piecing IQ 2013 BOM 5. Quilt Labyrinth quilt 6. Quilt Bermuda Sunrise quilt. 7. Quilt Joy quilt.  8. Quilt Stars for a New Day quilt.  9. Quilt Heartstrings charity quilt.  10. Quilt Stonehenge quilt.  11. Quilt Jewels quilt. 12. Quilt Hunter Stars quilt. 

SUE GRANT- 1. York's freedom-quilt and bind.  2. Butterfly kids quilt-quilt and bind. 3.  Double Vision L-7 - piece, quilt & bind. 4. Churn Dash quilt - quilt & bind. 5. Star quilt - quilt & bind.  6. Christmas tablerunner - quilt & bind. 7. Puzzler - quilt & bind. 8. Purse - finish making. 9. Chicken and Egg quilt - quilt & bind. 10. Block of the month from Adel - quilt & bind. 11. Christmas quilt from Prairie Star Quilts - quilt & bind. 12. Frosty Flake L-7 - quilt & bind. 

TERESA H: C0MPLETED ALL 12! 1. Finish embroidered horse & sleigh wall hanging 2. Quilt & bind charity quilt 3. Quilt & bind Blue Star block exchange quilt  4. Finish piecing, quilt & bind KC star quilt  5. Finish piecing, quilt & bind last years BOM 6. Repair vintage baby quilt for DH's aunt 7. Assemble Carrie Nation blocks, quilt, & bind (from retreat) 8. Make lap quilt for retreat 9. Make a throw pillow to use up my pillow form 10. Quilt & bind 1 of my vintage quilts 11. Quilt & bind 1 of my vintage quilts 12. Quilt & bind 1 of my vintage quilts

TRESSA J- 1. Disappearing 4 patch from L-7 -  finishing piecing quilt & bind 2. Finish apron 3. Purple strip lap quilt - quilt & bind 4. Purple flower quilt - bind 5. Make pillow out of sampler block - this block is from L-7 sampler quilt 6. Art quilt L-7 - quilt and bind 7. Heather's quilt - quilt & bind 8. Craftsy BOM 2012 - quilt & bind 9. Teal flower - quilt & bind 10. AQS mystery quilt 2012 - quilt & bind 11. CT mystery quilt - quilt & bind 12. Block Within - quilt & bind (maybe put a border on it, depends on the measurements) This one has been around for 10 years.

MONTHLY PROJECTS:

JANUARY-  Work on project #2

FEBRUARY- Work on project #5

MARCH- Work on project #12

APRIL- Work on project #1 

MAY- Work on project #11 

JUNE- Work on project #6

JULY- Work on project #3

AUGUST- Work on project #7

SEPTEMBER- work on project #10

OCTOBER- work on project #8

NOVEMBER- work on project #4

DECEMBER- work on project #9

 

Views: 6565

Replies to This Discussion

Better late than never, 'they' always say!!  I finally got #1 & #6 done on my DD list!  The blue and orange table topper/wall hanging was my first LA effort.  The IQ comfort quilt for our 'stash' is now bound and ready for a label when we might need one.

Beautiful quilts,Jackie! I especially like the pattern on the comfort quilt-hope we don't need one any time soon...

I know this challenge is closed, but I am going to finish these projects before the material rots! LOL

I just finished my #1 project this afternoon. Quilted it yesterday and bound and labeled it today. It was a 1/2 square triangle exchange with the Adel Quilt Circle of Friends.  The pattern is a free one from this site called Sorbet. I used all of the triangles, the last on the label.

#4 is a round robin the Jackie, Joyce ,Joyce's mom and I did way back when.  I just needed to quilt it.

#6 used to be a cross stitch pillow I recycled into a small Easter wall hanging for my bathroom.

I just have the final 2 to complete.

 

Magnificent - both of them.  Well worth waiting for!

Sorry, the middle pic is sideways.

Beautiful quilts! I especially like the fans in the middle one a nd the gorgeous colors in the first-and the Easter wall hanging is sew cute! I am also gtrying to finish up my dirty dozen,but have not foudn  the pillowcases yet! I had allmy UFOs in a laundry basket-went down to get them when that number was published-picked them up and then wandered around my fabric storage area and they disappeared! they are down there somewhere!! i did get 9 out of 12 finished,so it is a good start..

Awesome, Nancy!!  I really like the way Sorbet turned out.

Great job finishing those quilts Jackie and Nancy.  They're all beautiful!!  I still have 2 more to finish.  One is quilted and just needs binding.  The other is large and very detailed so will take some time - maybe this summer.

RSS

Country Fair

New & Exclusive! Country Fair Collection just $6.96/yard Shop now »

Chambray Tonals

New & Exclusive! Chambray Tonals just $6.96/yard. Shop now »

© 2020   Created by CT Admin.   Powered by

Badges  |  Report an Issue  |  Privacy Policy  |  Terms of Service